Public Works

Public-WorksSteve DiCamillo, Public Works Director

P. (719) 689-2125   F. (719) 689-0210
CLICK HERE TO SEND Steve DiCamillo AN EMAIL

Jodi Robinson, Administrative Assistant
CLICK HERE TO SEND JODI ROBINSON AN EMAIL

The Public Works Department maintains roads in the city year-round. It implements safety improvements to enhance vehicle and pedestrian safety, paves streets and performs preventive maintenance on existing paved streets. 

 

Mission statement:
To develop and maintain a smooth and safe surface transportation system.

Goals and objectives:
Implement safety improvements to enhance vehicle and pedestrian safety.
Expand the construction of curb, gutter and sidewalks as much as is financial possible.
Develop storm water control infrastructure that is adequate for 10-year storm events and that prevents excessive erosion.
Pave all unpaved streets within the city limits.
Perform adequate preventive maintenance to obtain the maximum useful life of all paved roads.

Fall Clean-Up Days September 21st & 22nd 9:00am-3:00pm

CRIPPLE CREEK RESIDENTS ONLY! PROOF OF RESIDENCY WILL BE REQUIRED!

NO REFRIGERATERS, FREEZERS, CONSTRUCTION MATERIALS, TIRES, BATTERIES, CHEMICALS, ELECTRONICS OR PAINT!

To schedule large item pick-up please call Public Works at 719-689-2125 PRIOR TO SEPTEMBER 20th.

(For Curbside Pick-Up We ONLY accept large items, i.e., couches, ranges; no household trash or small items will be accepted)

 

 

 

CCCC Application for Traffic Permit